The Code Planet
A Metalkitor guide

Metal Model Kits: Should You Buy for the Display or the Build?

How to pick a Metalkitor metal model kit by what you want from it: a short build with a frame or lights for display, or a long, articulated build for the fun of it.

If you mostly want a finished piece on the wall or shelf, pick a Metalkitor metal model kit with a low part count and a display feature built in, such as a frame or LED lights. If the build is the part you are paying for, pick a kit with a high part count, a medium rating and moving joints, or a working engine. The store lists parts, assembly time and difficulty on its product pages, so you can match a kit to the time you have before you buy. You can find the current code on our Metalkitor discount code page.

Build time and part count, kit by kit

Part count and the store’s own assembly time are the two numbers that tell you how much of a project you are taking on. These come from Metalkitor’s product pages.

Kit Parts Assembly time (store estimate) Difficulty Display feature
Mechanical lion head 237 2 to 3 hours 3 out of 10 Display frame for wall or desk
Centipede 480 About 3 hours Not listed Movable 22-link body
Mechanical panther 506+ 6 to 7 hours Medium Articulated crouching pose
War Scorpion King 1,200 9 to 12 hours Medium Built-in LED lighting
Mechanical jellyfish 800+ About 12 to 16 hours Not listed Built-in LED, works as a desk lamp
Mechanical mantis 1,200+ 16 to 20 hours Medium Movable joints, magnet-switched light

The panther page adds that the time depends on your own skill, and the same goes for every kit on the list. Treat the hours as a planning guide, not a promise.

Kits that suit a display-first buyer

If the result matters more than the evenings spent on it, look for three things: a short build, a feature that makes the finished piece easy to place, and a size that fits where it will go.

  • A frame or base. The mechanical lion head comes with a display frame (30 x 38 cm) so the finished model can hang on a wall like framed art or stand on a desk. At 237 parts and a 3 out of 10 difficulty, it is the shortest build in the table.
  • Lighting. The Scorpion King has integrated LEDs in the tail, claws and body, and the jellyfish has built-in LED lighting so it doubles as a desk lamp. Several butterfly and seahorse kits sit on a music box base.
  • Size. Check the finished dimensions before you choose a spot. The Scorpion King is listed at 33 x 25 x 21 cm, the jellyfish at 30 x 10 x 23 cm and the lion’s model at 15 x 17 cm before framing.

If you want a working engine on display without building it, the Cison L4-175 engine is offered in an assembled version as well as a kit, and the Cison FG-VT9 comes assembled.

Kits that suit a build-first buyer

If the hours at the table are the point, the bigger kits give you more to do and more moving parts to get right.

Metalkitor kuratis mech metal model
3d metal mechanical mantis kit, 1200pcs$129.99Image from the merchant
  • Articulated insects and animals. On the mechanical mantis kit, every joint is movable so you can pose it, and a light inside is switched by a magnet. It has 1,200+ parts and the longest listed time in the table. The mechanical panther puzzle kit sits in the middle at 506+ parts, and the store pitches it at builders who enjoy precision assembly.
  • Large mechs. The Monkey King Warrior mech is listed at 2,600 parts, and the store also sells a 1,300-piece mechanical robot with adjustable joints.
  • Working engines. The Toyan and Cison engine kits are real small combustion engines. You assemble the mechanism, then you still have to fuel, start and tune it, which is a different kind of project from a static model.

Metalkitor sorts its kits into easy, medium and difficult. If this is your first metal kit, starting in the easy group and moving up is the safer path, whichever way you lean.

How to choose in four questions

  1. How many hours can you give it? Compare your free time with the store’s estimate. A 2 to 3 hour lion head fits one afternoon. A 16 to 20 hour mantis is a project over several weekends.
  2. Where will it live? A wall suits the framed lion. A desk or bedside table suits a lit model like the jellyfish. A shelf suits the posed animals.
  3. Do you want it to move? The centipede’s 22-link body, the mantis joints and the panther’s articulation all let you change the pose after the build.
  4. Who is it for? Check the age line on the listing. The Scorpion King is marked 16 and up, and the Cison FG-VT9 engine 14 and up.

Whichever way you go, read the parts list on the listing and set aside a clear, well-lit table. Small screws and thin metal pieces are easy to lose, and the build goes better when every part has its place.

Questions

Should I buy a metal model kit for the display or for the build?

Decide which part you enjoy more. For display, pick a short build with a frame or lighting, such as the 237-part lion head. For the build itself, pick a high part count kit with moving joints, such as the 1,200+ part mantis, or a working engine kit.

How long does a Metalkitor metal kit take to build?

The store lists a time on each kit: about 2 to 3 hours for the lion head, about 3 hours for the centipede, 6 to 7 hours for the panther, 9 to 12 hours for the Scorpion King and 16 to 20 hours for the mantis. The panther page notes that the time depends on your own skill.

Does Metalkitor sell any models already assembled?

Among the engines, yes. The Cison L4-175 comes as a kit or an assembled version, and the Cison FG-VT9 ships assembled. The metal puzzle kits are sold for you to build.

Which metal kits have lights?

The Scorpion King has integrated LED lighting, the jellyfish has built-in LEDs and works as a desk lamp, and the mantis has a light inside that you switch with a magnet.

Is there an easy metal kit for a first build?

Metalkitor sorts its kits by difficulty (easy, medium, difficult). The lion head is rated 3 out of 10 with 237 parts, which makes it the gentlest start among the kits we compared.

Products in this guide

Shopping at Metalkitor? See the discount code 12% OFF Sitewide

More in this series